State the scale of work you take, list your equipment, explain who arranges permits and utility locates, and use the enquiry form to separate homeowners from commercial jobs.

What the site is actually for

Excavation covers an enormous range: a trench for a service line, a stump, a driveway, a foundation, a full site clearance.

The customers are equally varied, from a homeowner who has never hired heavy equipment to a general contractor who does it weekly.

Those two need entirely different information and produce entirely different enquiries.

So the site's first job is sorting, and its second is proving you have the equipment and the competence for whatever the visitor has in mind.

State the scale you work at

The clearest way to save wasted enquiries on both sides.

Say plainly whether you take small residential jobs, whether there is a minimum, and what the largest thing you handle looks like.

A homeowner wanting a half-day job needs to know you will take it, since many excavators will not, and will otherwise assume you are too large.

A developer needs to know you can handle the volume, and will assume the opposite if the site is full of small residential work.

Where you serve both, separate them into distinct pages rather than describing everything at once, because a page trying to address both convinces neither.

List the equipment

The second is the item homeowners care most about and contractors ask first: whether a machine can get through a gate, down a side path, or into a back yard without removing a fence.

Access is the deciding question

For residential work particularly, and it is worth its own page.

Explain what access you need, in measurements: minimum gate width, overhead clearance, and what surfaces you can cross.

Say what happens where access is tight, including whether you have smaller equipment or whether hand work is an option.

Address the damage question directly, since it is what every homeowner is thinking: what protection you use on lawns and driveways, and what you will and will not be responsible for.

Invite photographs of the access route, which lets you assess most jobs without a visit and is far quicker for everybody.

Permits, locates and who arranges them

The compliance content, and it builds credibility faster than any claim about experience.

Explain that underground utilities must be located before digging, how that process works, and who initiates it.

Say which permits a job may need, that requirements vary by municipality, and whether you handle the applications or the customer does.

Mention timelines, since a homeowner expecting to book next week needs to know that locates and permits take time.

A contractor who explains this clearly is demonstrating that they do it properly, which is the thing a customer cannot otherwise verify.

Keep it general on the specifics, since rules differ by municipality, and point people to the relevant authority rather than restating requirements that change.

A worked example

An excavation business had a site with a photograph of an excavator, a list of services, and a contact form.

Most enquiries were residential and small, and most needed a long call to establish access, scale, and whether the job was viable.

They added an equipment page with machine sizes and minimum access widths, a page about permits and locates explaining who does what, and rebuilt the form to ask for the job type, the access route, and photographs.

Enquiries arrived with photographs attached, which let them quote or decline most jobs without attending.

The number of site visits that produced no work fell substantially, which was the actual cost they had been carrying.

Insurance, safety and certifications

What commercial clients check before they will consider you.

State your liability coverage and that you carry workers compensation registration in good standing.

Name relevant certifications and safety programme participation, since a general contractor will need them before you can work on their site.

Make the documents easy to request, since somebody will ask, and a business that supplies them within an hour looks different from one that takes three days.

For residential customers this matters less, and stating it plainly still reassures somebody letting machinery onto their property.

Photographs that show scale and finish

Since the work is visual and most excavation sites publish the wrong pictures.

Before and after is the format, because the interest is in what changed rather than in a machine.

Include the tidy-up, since customers worry about being left with a mess and almost nobody shows the finished, restored site.

Show a range of scales, so both audiences see something like their own job.

And show tight access work if you do it, which is the single most persuasive photograph a residential excavator can publish.

Say how you charge

Since excavation pricing is opaque to homeowners and the confusion produces bad enquiries.

Explain the basis: whether you charge hourly with the machine and operator, by the day, or by the job, and what the minimum is.

Say what is extra, particularly haul-away and disposal, which are frequently a large share of the cost and are not what a customer is picturing.

Mention that disposal is charged by volume and material, since a homeowner imagining a small pile does not know that contaminated or mixed material costs considerably more to tip.

A rough hourly figure with the extras named produces better enquiries than no figure, and it prevents the conversation where a customer expected a quarter of the price.

The counter-case

Many excavation businesses run entirely on contractor relationships.

If your work comes from three builders who call you directly, the site is a credential check rather than a source of enquiries, and a single page confirming you exist and are insured may be sufficient.

Publishing residential capability also invites enquiries you may not want, and a business at capacity on commercial work should think about whether it wants them.

And seasonality is real here, so publishing availability that is out of date is worse than not addressing it.

State the scale, list the machines with access dimensions, explain permits and locates, and ask for photographs.

What to build first

  1. The scale of work you take, including minimums.
  2. An equipment page with machine sizes.
  3. Minimum access dimensions.
  4. Permits and locates, and who arranges them.
  5. Insurance and safety details.
  6. A form asking job type and access photographs.
  7. Before and after photographs, including tidy-up.

Step six removes the largest hidden cost in this trade, which is attending sites that were never going to produce work.

A comparable industrial trade is covered in what a welding shop website needs.


Frequently asked questions

What is the site's first job?

Sorting enquiries. A homeowner wanting a stump removed and a developer needing a site cleared need different information and produce entirely different enquiries.

Why state the scale of work?

Because a homeowner will assume you are too large for a half-day job, and a developer will assume you cannot handle volume if the site shows only small residential work.

What equipment detail matters most?

Your smallest machine and the minimum access dimensions, since whether a machine fits through a gate or down a side path decides most residential jobs.

Should I explain permits and locates?

Yes. Explaining that utilities must be located, who initiates it, and what permits may be needed demonstrates you do it properly, which a customer cannot otherwise verify.

What should the enquiry form ask?

Job type, the access route, and photographs. Photographs let you quote or decline most jobs without attending, which is the real cost in this trade.

Which photographs work?

Before and after, including the finished tidy-up that almost nobody shows, a range of scales, and tight access work if you do it.

West Coast Media Solutions Inc. provides web design, web development, hosting, digital marketing, and business consulting to organisations across Canada, drawing on more than twenty-five years in the field.

Attending sites that produce no work?

Ask for photographs of the access route on the form. Most jobs can be assessed or declined without a visit.

Start a Conversation